EasyManua.ls Logo

Tecnam P2012 - Page 6

Tecnam P2012
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P2012
AIRCRAFT MAINTENANCE MANUAL
Revision Revised chapter /
page
Description of Revision
Reference
0
27-10/5 Updated point 1 in ‘’Operation’’
chapter
Under DOA
privileges
(DOA ref.
EASA21J.335)
27-10/201 to 212 Added procedures ‘’Aileron Control
Line Pulleys Removal/Installation’’
and related figures
27-10/213 to 222 Added procedures‘’Aileron Control
Line cables Removal/Installation’’ and
related figures
27-10/223, 224 Added procedure ‘’Aileron Control
Cable Tension Adjustment’’ and
related figure
27-10/225 to 235 Updated procedures ‘’Control wheel
assy removal/installation’’ and related
figures. Added new figures for
procedures.
27-10/236 to 240 Added procedures ‘’Control Column
assy Removal/Installation’’ and
related figures
27-10/241 to 243 Updated procedures ‘’Control Rod
Removal/Installation’’ and related
figures
27-10/244 to 247 Added procedures ‘’Outer
Interconnecting Rod
Removal/Installation’’ and related
figures
27-10/248 to 251 Added procedures ‘’Inner
Interconnecting Rod
Removal/Installation’’ and related
figures
27-10/256 to 260 Added procedures ‘’Central
Interconnecting Rod
Removal/Installation’’ and related
figures
27-10/261 to 264 Updated procedures ‘’Outer Aileron
Bellcrank Removal/Installation’’ and
related figures
27-10/265 to 268 Updated procedures ‘’Middle Aileron
Bellcrank Removal/Installation’’ and
related figures
27-10/269 to 271 Updated procedures ‘’Inner Aileron
Bellcrank Removal/Installation’’ and
related figures
27-10/272 to 278 Updated procedures ‘’Aileron Control
Line Rigging’’ and related figures
RECORD OF REVISIONS
Page 4
5
th
Edition - Rev. 0

Related product manuals