P2012
AIRCRAFT MAINTENANCE MANUAL
Revision Revised chapter /
page
Description of Revision
Reference
0
27-10/5 Updated point 1 in ‘’Operation’’
chapter
Under DOA
privileges
(DOA ref.
EASA21J.335)
27-10/201 to 212 Added procedures ‘’Aileron Control
Line Pulleys Removal/Installation’’
and related figures
27-10/213 to 222 Added procedures‘’Aileron Control
Line cables Removal/Installation’’ and
related figures
27-10/223, 224 Added procedure ‘’Aileron Control
Cable Tension Adjustment’’ and
related figure
27-10/225 to 235 Updated procedures ‘’Control wheel
assy removal/installation’’ and related
figures. Added new figures for
procedures.
27-10/236 to 240 Added procedures ‘’Control Column
assy Removal/Installation’’ and
related figures
27-10/241 to 243 Updated procedures ‘’Control Rod
Removal/Installation’’ and related
figures
27-10/244 to 247 Added procedures ‘’Outer
Interconnecting Rod
Removal/Installation’’ and related
figures
27-10/248 to 251 Added procedures ‘’Inner
Interconnecting Rod
Removal/Installation’’ and related
figures
27-10/256 to 260 Added procedures ‘’Central
Interconnecting Rod
Removal/Installation’’ and related
figures
27-10/261 to 264 Updated procedures ‘’Outer Aileron
Bellcrank Removal/Installation’’ and
related figures
27-10/265 to 268 Updated procedures ‘’Middle Aileron
Bellcrank Removal/Installation’’ and
related figures
27-10/269 to 271 Updated procedures ‘’Inner Aileron
Bellcrank Removal/Installation’’ and
related figures
27-10/272 to 278 Updated procedures ‘’Aileron Control
Line Rigging’’ and related figures
RECORD OF REVISIONS
Page 4
5
th
Edition - Rev. 0