P2012
AIRCRAFT MAINTENANCE MANUAL
Revision Revised chapter /
page
Description of Revision
Reference
0
27-10/279 to 284 Updated procedures ‘’Aileron Trim
Electrical Actuator
Removal/Installation’’ and related
figures (Mod 2012/169, JC 1446 and
TR-AMM-212-012)
Under DOA
privileges
(DOA ref.
EASA21J.335)
27-10/285 Added procedure ‘’Aileron Trim
Control System Travel Test’’
27-20/5 Updated point 1 in ‘’Operation’’
chapter (Mod 2012/169, JC 1446 and
TR-AMM-212-012)
27-20/101 Updated Table ‘’Fault Isolation’’
27-20/201 to 203 Updated procedures ‘’Rudder trim
Electrical Actuator
Removal/Installation’’ and related
figures
27-20/204 to 206 Added procedures ‘’Rudder Trim
Electrical Actuator
Removal/Installation and related
figure (Mod 2012/169, JC 1446 and
TR-AMM-212-012)
27-30/1, 5 Added point 2 in ‘’Operation’’ and
added figure (Mod 2012/188 or TR-
AMM-212-014)
27-30/201 to 203 Updated procedures ‘’Elevator Rear
Control rods Removal/Installation’’
and related figure
27-30/204 to 207 Added procedures ‘’Elevator Front
Control Rod removal/installation’’
and related figures
27-30/208 Updated procedure ‘’Elevator trim
Tab Lever Replacement’’
27-30/211 to 219 Added procedures ‘’Elevator Rear
Bellcrank Removal/Installation ‘’,
‘’Elevator front bellcrank
Removal/Installation’’ and related
figures
27-30/220, 221 Updated procedure ‘’Elevator Control
Cables Tension Adjustment’’ and
related figure
27-30/222 to 233 Added procedures ‘’Elevator Control
Cables Removal/Installation’’ and
related figures
27-30/234 to 238 Added procedures ‘’Elevator Control
Line Rigging’’ and related figures
27-30/239 to 244 Added procedures ‘’Elevator trim
Control Cables Replacement’’ and
related figures
RECORD OF REVISIONS
Page 5
5
th
Edition - Rev. 0