Instruction and maintenance manual
ENGLISH
11.3 Weekly maintenance
These operations, which have to be carried out by
the operator at the end of the weekly production,
shall include:
Inspection of the indicator lights;
Inspection of the buttons.
11.4 Monthly maintenance
These operations, which are based on a daily work-
ing shift of 8÷10 hours and must be performed by
qualied and skilled personnel only, include:
Visual inspection of the terminal boards, the mag-
netic chucks and the controllers;
Visual inspection of the cables and plugs.
11.5 Maintenance to be carried out every
six months
These operations, which are based on a daily work-
ing shift of 8÷10 hours and must be performed by
qualied and skilled personnel, include:
Disconnection of the discharge cables of the
magnetic chucks from the connection boxes;
Measurement of the resistance and insulation val-
ues at 500V;
Reconnection of the discharge cables of the mag-
netic chucks to the connection boxes.
11.6 Extraordinary maintenance
Maintenance operations not specically described in
this manual are considered extraordinary mainte-
nance and must be carried out by qualied person-
nel specically authorized by TECNOMAGNETE
S.p.A.
11.7 Information on extraordinary
reparation and maintenance
The sections that follow provide a dimensional lay-
out and assembly instructions for each chuck model
to simplify troubleshooting.
TECNOMAGNETE S.p.A. can be contacted at any
time for further information or queries regarding the
operation and maintenance of the controller.