EasyManua.ls Logo

TED 1001 - Part III Quick Start Installation

Default Icon
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Energy, Inc. 3297 Pacific Street Charleston, South Carolina 29407 (843) 766-9800
Page 7
P A R T I I I Q U I C K S T A R T I N S T R U C T I O N S
Do not begin installation until you have read ‘Part II - Safety’
Read all Instructions before beginning installation
Estimated Installation Time:
Professional Installer: 15 – 30 minutes
Equipment Needed:
Flathead screwdriver - small and large
Phillips screwdriver - small and large
Flashlight
QUALIFIED ELECTRICIANS OR PROFESSIONAL INSTALLERS FAMILIAR WITH ALL
ASPECTS OF ELECTRICAL WIRING AND THEORY, MAY USE THE FOLLOWING CON-
DENSED INSTRUCTIONS FOR INSTALLATION OF TED.
ALL OTHERS SHOULD FOLLOW THE DETAILED INSTRUCTIONS IN APPENDIX A.
This model of TED is suitable for installation on a single 120/240V single phase 60Hz ser-
vice, normally found in North America (USA, Canada, Mexico and portions of the Carib-
bean). It is not suitable for three-phase service, for service where there are two or more
main circuit breakers or for 230V 50Hz service commonly found in other regions of the
world. Other models of TED are available for these applications. Please refer to our TED
Web site:
www.theenergydetective.com
All wiring in the United States must be installed in accordance with the latest adopted edition
of the National Electrical Code (ANSI/NFPA 70, NEC) and state or local requirements. All
wiring in Canada must be installed in accordance with the latest adopted edition of the Ca-
nadian Electrical Code (CSA C22.2 CEC, Part I) and any provincial or local requirements.