10
temperature can compromise its performance and, in more serious cases, cause the appliance’s
protections to start up.
Therefore, consider the most critical room conditions that can be reached in that position before making a
choice.
Level the appliance by acting on the individual feet.
This appliance can only be installed and operate in rooms which are permanently ventilated, in order
to guarantee correct operation.
Connect and leave for a certain period of time (at least 2 hours) before checking functioning. During
transport it is probable that the compressor lubricant oil has entered the refrigerant circuit blocking the
capillary: as a consequence the appliance will function for a certain period of time without producing cold
until the oil has returned to the compressor.
ATTENTION: the appliance requires the minimum functioning spaces, as shown in the attachments.
The defrosting water and the water that forms at the bottom of the refrigerating compartment during
operation or during periodical internal cleaning must be drained through a prearranged hose with a
minimum diameter 3/4 connected to the hose at the bottom of the chiller.
A drain trap should also be guaranteed. The drain must be in compliance with Standards in force.
6.3 Electric Power Supply Connection
Connection must be carried out by authorized and qualified staff, respecting the current laws regarding
the subject and using appropriate prescribed material.
Before connecting the appliance to the electric mains, check that the voltage and the frequency
correspond to the data stated on the registration plate applied in the rear of the appliance.
Before connection, ensure the presence of a relevant differential switch with adequate power in the
mains power supply, upstream from the appliance, in order to protect the appliance from overloads or
short circuits
6.4 Inspection
The appliance is delivered in conditions such that it can be started-up by the user.
This functionality is guaranteed by passing the tests (electric inspection-functional inspection,
appearance inspection) and relative certification through the specific attachments.
At least the following should be checked after installation:
Check the electric connections.
Check the functionality and efficiency of drains.
Check that there are no tools or materials left in the appliance that could jeopardize its functionality or
even damage the machine.
Have the appliance perform at least one complete chill blasting/shock freezing cycle.