EasyManua.ls Logo

Tektronix TCP312 - TCP305 and TCP312 Performance Verification

Tektronix TCP312
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TCP305 and TCP312 Performance Verication
TCP305 and TCP
312 Performance Veri cation
The test proc
edures in this section verify warranted specications and
proper performance of the TCP305 and TCP312 current probes, using the
TCPA300 Amplier. Tolerances that are specied in these procedures apply to the
amplier and current probe and do not include test equipment error.
Before starting these procedures, photocopy the appropriate test record to record
the performance test results. (See page 29, TCP305 Current Probe Test Record.)
The recommended calibration interval is one year.
NOTE. If the amplier is not properly terminated into 50 ,theNOT
TERMINAT
ED INTO 50 status LED is on. Verify that the 50 termination is
connected at the D MM input when performing the following procedures.
No prob
eoramplier adjustments are required during these test p rocedures. If
any tests fail, information is available. (See page 50, TCP305 and TCP312 DC
Gain Adjustment.)
WARNING. Magnetic elds are produced in these procedures that may cause a
malfunction in heart pacemakers or damage to sensitive equipment.
TCPA300/400 Ampliers and TCP300/400 Series Current Probes Service Manual 19

Table of Contents

Related product manuals