EasyManua.ls Logo

Terex AL4 - Page 23

Terex AL4
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
August 2016
3 - 4 AL4 • AL4000 Part No. 218567
Section 3 • Scheduled Maintenance Procedures
Checklist D Y N R
Perform every 1500 hours:
D-1 Engine maintenance -
Kubota models
Perform every 8000 hours:
D-2 Generator -
Leroy Somer Models
Perform annually:
D-3 Coupler
Checklist E Y N R
E-1 Cable
Perform every 2000 hours:
E-2 Engine maintenance
Perform every 3000 hours:
E-3 Engine maintenance
Perform every 10,000 hours:
E-4 Generator -
Marathon Models
Perform every 20,000 hours:
E-5 Generator -
Leroy Somer Models
Perform every 30,000 hours:
E-6 Generator -
Leroy Somer Models
Comments
Instructions
• Make copies of this report to use for
each inspection.
• Select the appropriate checklist(s) for
the type of inspection to be performed.
Daily or 8 hours
Inspection: A
Quarterly or 250 hours
Inspection: A+B
Semi-annually or
500 hours
Inspection: A+B+C
Annually or
1000 hours
Inspection: A+B+C+D
Two year or
2000 hours
Inspection: A+B+C+D+E
• Place a check in the appropriate box
after each inspection procedure is
completed.
• Use the step-by-step procedures in
this section to learn how to perform
these inspections.
• If any inspection receives an “N”, tag
and remove the machine from service,
repair and re-inspect it. After repair,
place a check in the “R” box.
Legend
Y = yes, acceptable
N = no, remove from service
R = repaired
Model
Serial number
Date
Hour meter
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
MAINTENANCE INSPECTION REPORT
Discount-Equipment.com

Table of Contents