EasyManua.ls Logo

Terex AL4 - Checklist E Procedures; Perform Engine Maintenance; Replace the Mast Lift Cable

Terex AL4
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
August 2016
3 - 32 AL4 • AL4000 Part No. 218567
Section 3 • Scheduled Maintenance Procedures
E-1
Replace the Mast Lift Cable
Terex specifi cations require that this procedure be
performed every two years.
The mast cable is responsible for the raising
and lowering of the mast and lights. Regular
replacement of the mast cables is essential to
good machine performance and safe machine
operation.
1 Replace the mast lift cable. Refer to Repair
Procedure 1-1, How to Replace the Mast Lift
Cable.
E-2
Perform Engine Maintenance
Engine specifi cations require that this procedure
be performed every 2000 hours or bi-annually,
whichever comes fi rst.
Kubota D1105:
• Replace coolant
• Replace radiator hoses and clamps
• Replace fuel hoses and clamps
• Replace air intake hose and clamps
Perkins 403D-11:
• Inspect alternator
• Replace crankcase breather
• Inspect engine mounts
• Inspect starter
Required maintenance procedures and additional
engine information is available in the
Kubota D1105 Operators Manual
(Kubota part number 16622-89166) OR the
Perkins 403D-11 User's Handbook
(Perkins part number SEBU8311-01).
Kubota D1105 Operators Manual
Genie part number 131379
Perkins 403D-11 User's Handbook
Genie part number 131661
Checklist E Procedures
Discount-Equipment.com

Table of Contents