Preinstallation
Check
List
Use this check list to ensure that all preinstallation steps have been
performed. You will then be ready to install the system.
Location
D The location is easily accessible to Thermo Nicolet personnel.
D The system fits through the necessary doorways and elevators.
D There are no floor vibrations from air conditioners, motors, and
the like.
D There are no intense magnetic fields.
D The floor and table(s) are strong enough to support the system.
D The table height is convenient for use
of
the spectrometer and
all accessories.
D There is adequate clearance around and above the system.
D A telephone is available within reach
of
the operator on line.
Environmental considerations
D There is no static-producing carpet.
D No windows are nearby.
D The temperature stays between 16° and 27°C (60° and 80°F),
20° and
22°c
(68° and 72°F) for best performance.
D The humidity (noncondensing) is between 20% and 80%.
D The environment is free
of
dust.
Utility service
D A dedicated power line is available.
D There is sufficient power to run the spectrometer and all
accessories.
D There is a definite earth ground (not neutral) for power outlets.
D Adherence to local building and safety codes is verified.
D A source
of
dry air
or
nitrogen is installed,
if
you have a humid
environment.
Preparing Your Site
37
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com