EasyManua.ls Logo

Thermo Pride OD6FA072D48 - Initial Furnace Operation; Initial Burner Operation Procedures

Thermo Pride OD6FA072D48
43 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
NOTICE: This oil furnace must be installed and adjusted by only qualified
oil heating contractor using calibrated combustion test instruments to
ensure safe and reliable operation of the furnace.
Fuel System Installation
In situations where the oil storage tank is installed at the same level with, or
above, the burner, a single oil supply line run from the oil tank to the burner will
be usually be adequate. No return line will be required. If the oil tank is installed
below the burner and the lift exceeds approximately 6-ft., an oil supply line and
an oil return line are recommended.
Refer to the Standard for the Installation of Oil-Burning Equipment, NFPA 31-
2020, or latest edition and the oil burner operating instructions for detailed
information on oil storage tank & oil supply/return line installation.
NOTICE: We recommend installing a high efficiency oil filter, in the oil
supply line, capable of filtering 10 to 20 micron diameter (or preferably
smaller) particles from the fuel.
Initial Operation of Furnace
Initial Burner Operation:
c
IMPORTANT: The start-up sheet found in Appendix A of this manual should be
completed.
1. Turn the electrical disconnecting switch to the “OFF” position.
2. Set the room thermostat above room temperature.
3. Be sure the oil tank is full of clean # 2 fuel oil.
4. Open all shutoff valves in the oil line.
5. Refer to the oil burner manufacturer’s operating instructions (included
with the furnace) for detailed startup instructions
6. Measure the oil pump pressure. If required, adjust it to deliver the
appropriate pressure for the burner. The oil pump should be set to
produce,
120 PSIG, for the R.W. Beckett model AFG burner
140 PSIG, for the Riello model BF3
120 PSIG, for the Carlin model EZ-1HP
7. Carbon Dioxide (CO2) and Carbon Monoxide (CO) – In order to assure
that proper and safe combustion are taking place, carbon dioxide and
carbon monoxide measurements must be taken. A CO2 reading within

Related product manuals