EasyManua.ls Logo

THORLABS PM100A - 2 Getting Started; 3 Unpacking; Preparation

THORLABS PM100A
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.1 Preparation
8
2 Getting Started
3 Unpacking
Inspect the shipping container for damage.
If the shipping container seems to be damaged, keep it until you have inspected the
contents and you have inspected the PM100A mechanically and electrically.
Verify that you have received the following items within the hard-case:
1. PM100A power meter console
2. Plug-In power supply with Interchangeable primary plug for USA, UK, Europe,
and Australia
3. USB cable, type „A‟ to „mini-B‟
4. Quick-start guide
5. USB memory stick with instrument drivers, user application and operation
manual
6. Certificate of Calibration
3.1 Preparation
Configure the plug-in power supply with the primary plug for your local power supply.
Connect a suitable power or energy sensor.
Turn the unit on by pressing the power button in the side panel.
After switching on the unit, the graphics display will show the device status and then
jump to the last measurement screen before power down.
The PM100A is immediately ready to use after turning on.

Table of Contents

Related product manuals