EasyManua.ls Logo

THORLABS PM100A - Page 4

THORLABS PM100A
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
5.8 Beam Diameter vs. Active Sensor Area 25
5.9 Fiber Based Measurements 26
6 Computer Interface 27
6.1 PM100 Utility Software 27
6.1.1 Front Panel 28
6.1.2 Description of the Front Panel Elements: 28
6.2 Firmware Update 31
6.3 Simple LabVIEW Example using SCPI Commands 32
6.4 Using the Instrument Drivers 36
6.5 SCPI Commands 37
6.5.1 An Introduction to the SCPI language 37
6.5.2 IEEE488.2 Common Commands 40
6.5.2.1 Command summary 40
6.5.2.2 Command reference 41
6.5.2.3 PM100D specific SCPI Command Reference 42
6.6 Maintenance and Repair 52
6.7 Maintenance 52
6.8 Troubleshooting 53
7 Appendix 54
7.1 Warranty 54
7.2 Certifications and compliances 55
7.3 Technical data 56
7.4 Pin Assignment of the Sensor Connector 58
7.5 Thorlabs „End of Life‟ policy (WEEE) 59
7.5.1 Waste treatment on your own responsibility 59
7.5.2 Ecological background 60
7.6 List of figures 61
7.7 Addresses 62

Table of Contents

Related product manuals