Operation Manual
13
4. CHART PANEL CONFIGURATION.
If TCP-2000 Chart Panel is securely installed in its operating position, connect the
power cord to the panel first, then the plug power cord to the power outlet. Chart
Panel will start automatically. Flashing LED in bottom right corner will indicate
start-up process. The panel requires approximately 30 seconds for initialization.
When the LED stops flashing and turns into green and the welcome screen is
displayed, the Chart Panel is ready to use. Install battery into remote control unit
and enter Configuration MENU to set-up Chart Panel options.
Before you start tests on patient you have to configure
TCP-2000 properly. To acquire reliable test results it is
necessary to set proper distance between patient and the Chart
Panel. Please refer to chapter 4.1.
Configuration MENU
To enter Configuration MENU press SETUP button.
Following options are available:
Pic. 2. Configuration MENU
WARNING !