Figure6
1.Liftloop
7.Carefullyremovethescrewsholdingtheblowertothe
woodpallet.Afterthescrewsareremoved,slidethe
crateawayfromtheblowerandlowerthebloweruntil
thecastorwheelstouchtheoorbutthestrapisstill
tight(Figure7).
Figure7
1.Screws
8.Insertthejackstandtubeintotheframetube,align
theholesandsecureitintopositionwiththesnapper
pin(
Figure8).
Figure8
1.Frametube3.Jackstand
2.Snapperpin
9.Removethecabletiesecuringthecrankhandletothe
jackcrank.
10.Crankthejackstanddownuntilthejackpadislevel
withthecastorwheeltires.
11.Removethestrapfromtheblowerliftloop.
2
InstallingtheDriveShafttothe
BlowerGearBoxShaft
Partsneededforthisprocedure:
1
Driveshaftassembly
1Rollpin
2
Bolt,5/16x1-3/4inch
2
Locknut,5/16inch
Procedure
1.Removethecabletiesecuringthedriveshafttothe
shippingcrate.
2.Slidethedriveshaftontothegearboxshaft.Alignthe
mountingholesinthegearboxshaftwiththeholesin
thedriveshaftandslidethemtogether.
8