Figure9
1.Rollpin
4.Bolts,5/16x1–3/4inch
2.Safetychain(2)5.Locknuts,5/16inch
3.Driveshaft6.Gearboxshaft
3.Securethemwitharollpin(Figure9).
4.Securethedriveshafttothegearboxshaftwithtwo
5/16x1–3/4inchboltsand5/16inchlocknuts
(Figure9).
5.Torquetheboltsandlocknutsto18to25N-m(175
to225in-lb).
6.Removethecabletiekeepingthedriveshafttogether
7.Securethesafetychaintoblowerframe(Figure9).
3
InstallingtheMountingPlate
totheDebrisBlowerFrame
Partsneededforthisprocedure:
1Mountingplate
4
Bolt,1/2x1-1/4inches
4
Locknut,1/2inch
Procedure
1.Removetheboltssecuringthemountingplatetothe
crate(
Figure10).
Figure10
1.Mountingplate
2.Installthemountingplatetothedebrisblowerframe
with(4)1/2x1-1/4inchboltsand(4)1/2inch
locknuts(Figure11).Usethelowersetofholeson
eachsideofthemountingplatewheninstalling.Torque
theboltsto92to113N-m(68to82ft-lb)
Figure11
1.Mountingplate
3.Locknut(4)
2.Bolt(4)
9