EasyManua.ls Logo

Toro Hydroject 3000 - Performing the Accumulator Pressure Test

Toro Hydroject 3000
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TORO Hydroject® 3000/4000 Water System Testing
NOTES
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
____________________________________________________________________________________________________________
69
Performing the Accumulator Pressure Test
1. With the unit shut off, and the pressure relieved from the high-pressure water circuit.
2. Remove the protective cover from the accumulator service valve.
3. Connect the accumulator charging tool.
4. Verify that both shut-off valves are closed.
5. Turn the valve jam nut counter clockwise approximately 2 turns.
6. Read pressure on the gauge.
7. Pressure should be 1800 to 2800 PSI (when recharging, charge the accumulator to 2500 PSI).

Table of Contents

Other manuals for Toro Hydroject 3000

Related product manuals