EasyManua.ls Logo

Toro Titan Z5200 - Page 120

Toro Titan Z5200
172 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE
6-92007 - 2008 Titan Z Service Manual
6
13. Install the fuel line and clamp on the fuel shut-off
valve and turn the valve to the “OPEN” position (Fig.
338).
12. Move the throttle control lever on the control panel
to the low throttle position. Position the throttle cable
into the top of the throttle cable clamp, push the
throttle cable until the throttle linkage on the engine
stops. Tighten the throttle cable clamp (Fig. 337).
14. Install a key into the crankshaft keyway (Fig. 339).
Fig. 337 IMG-0412
Fig. 338 IMG-0414
Fig. 339 IMG-0415
15. Apply anti-seize compound to the crankshaft (Fig.
340).
Fig. 340 IMG-0416

Other manuals for Toro Titan Z5200

Related product manuals