December 2002 TOSHIBA TEC 10 - 7 e-STUDIO160/200/250 DRIVE SYSTEM
031-1
Fig. 10-3-4
Screw
Clamp
Main drive gear assembly
Harness
Connector
Screw
031-2
Fig. 10-3-5
16. Detach 2 connectors from the PWA.
17. Release the harness from inside the copier, re-
move 7 screws, and remove main drive gear
assembly.
Note: When the main drive gear assembly is at-
tached, adjust it by referring to the Service
Handbook. (See chapter 1.9)
Screw
Pulley
Timing belt 176
Main motor
Connector
[B] Main moter
(e-STUDIO160 series)
1. If a STP (KK-1600) is attached to the copier,
disconnect the power cable.
2. Detach the manual pocket.
3. Detach the toner cartridge and the process unit.
4. Detach rear cover. (See Fig. 2-6-1)
5. Detach 2 connectors form the PWA.
6. Remove 3 screws and remove main motor.
Notes: 1. After attaching the main motor, rotate the
main motor to make sure that the cou-
pling of the process unit rotates.
2. Seeing from the gap of the main drive
gear cover assembly, confirm that the
timing belt is securely installed.