e-STUDIO200L/202L/203L/230/232/233/280/282/283 © 2004 - 2008 TOSHIBA TEC CORPORATION All rights reserved
GENERAL OPERATION
4 - 2
4.2 Description of Operation
4.2.1 Warming-up
1) Initialization
Power ON
→ Heater lamp ON
→ Set number “1” reproduction ratio “100%” and “WAIT WARMING UP” are displayed
→ Fan motors ON
→ Initialization of scanning system
- The carriage moves to the home position.
- The carriage moves to the peak detection position.
- The exposure lamp is turned ON.
- Peak detection (white color is detected by the shading correction plate)
- The exposure lamp is turned OFF.
→ “READY (WARMING UP)” is displayed
2) Pre-running operation
The pre-running operation is started when the temperature of the fuser roller surface reaches a cer-
tain temperature.
→ The main motor is turned ON.
- Fuser roller rotated
- Drum rotated
→ Initialization of feeding system
- Each drawer tray goes up.
→ Pre-running operation stops after five seconds.
3) When the surface temperature of the fuser roller becomes sufficient for fusing,
→ “READY” is displayed.
4.2.2 Ready state (ready for copying)
Buttons on the control panel enabled
→ When no button is pressed for a certain period of time,
- Set number “1” and reproduction ratio “100%” are displayed. Equipment returns to the normal
ready state.