EasyManuals Logo

Trace Engineering SW Series User Manual

Trace Engineering SW Series
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
©1999 Trace Engineering
Wiring Check
Before placing the system into operation for the first time (or after repairs or rewiring is performed),
recheck all system wiring before placing the system into operation.
Check the ac loads (to the sub-panel) and source (from the utility main panel or generator) are connected
properly in the AC Disconnect/Bypass box.
Ensure there are no neutral/ground bonds (except in the main utility panel).
Use a dc voltmeter to confirm the batteries are wired correctly and the polarities are correct.
Check the PV array wiring is properly connected (positive wire to the lower terminals on the PV array
disconnects).
CAUTION: PERMANENT SYSTEM DAMAGE CAUSED BY IMPROPER WIRING IS NOT COVERED
UNDER WARRANTY. DO NOT SKIP THE ABOVE STEPS!
After the checks are completed, install the covers on the Power Panel components, main utility and sub-
panels.
22
2.0 INSTALLATION

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trace Engineering SW Series and is the answer not in the manual?

Trace Engineering SW Series Specifications

General IconGeneral
BrandTrace Engineering
ModelSW Series
CategoryInverter
LanguageEnglish

Related product manuals