CONCRETE MOISTURE ENCOUNTER X5 USER GUIDE
25
1
Seal cap
Hygro-i2 probe
Hygrohood
2
Seal the Hygrohood to the
surface with butyl tape provided
Ensure the surface is clean
to achieve an airtight seal
3
Place the probe in the RH hood.
Press down the cap
to seal
4
Leave the Hygrohood in place
for the period of time
specified by the standard
being followed.
5
Connect your
Tramex Meter
to take readings
6
A probe calibration check, is
recommended within
30 days of testing
HOOD INSTRUCTION