EasyManua.ls Logo

Trane Technologies IntelliPak Signature SCWF - Refrigerant Systems

Trane Technologies IntelliPak Signature SCWF
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
SCXF-SVX01T-EN
raise the coil box up against the unit and install the
mounting screws. Recommended lifting points are at
each end of the coil box.
6. Avoid routing wires over devices and sharp edges. Use
wire ties about every 12 inches to secure wires to other
wire harnesses.
7. Move the entering air temperature sensor upstream of
the coil to ensure proper operation.
Refrigerant Systems
Trane Water Cooled Commercial Self-Contained units ship
factory charged with R-410A refrigerant.
Installation - Mechanical

Table of Contents

Related product manuals