SSAAFFEETTYYWWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
June 2020
1188--EEBB3300DD11--11GG--EENN
Single Packaged Cooling/Electric Heat
14 SEER Convertible, 2 5 Ton
4TCC4024A1000A
4TCC4030A1000A
4TCC4036A1000A
4TCC4042A1000A
4TCC4048A1000A
4TCC4060A1000A
NNoottee:: “Graphics in this document are for representation only. Actual
model may differ in appearance.”
Installer’s Guide
Question and Answer IconNeed help?

Do you have a question about the Trane 4TCC4030A1000A and is the answer not in the manual?

Trane 4TCC4030A1000A Specifications

General IconGeneral
Model Number4TCC4030A1000A
CategoryHeat Pump
BrandTrane
Cooling Capacity (BTU/h)30000
SEER Rating14
HSPF Rating8.2
Voltage208/230
Phase1
Refrigerant TypeR-410A
Tonnage2.5
Heating Capacity (BTU/h)36000
Compressor TypeClimatuff

Summary

Determine Unit Clearances

Review Location and Recommendation Information

Unit Installation

Lifting and Rigging

Procedures for safely lifting and rigging the unit.

Ductwork Installation

Procedures for installing ductwork for different configurations.

Condensate Drain Piping

Guidelines for condensate drain piping installation.

Air Filter Installation

Information on installing air filters.

Control Wiring

Instructions for low-voltage control wiring.

Unit Startup

Pre-Start Checklist

Checklist before starting the unit for the first time.

Operating Pressure Checks

Procedure for checking operating pressures after startup.

Voltage Check

Procedure for checking unit voltage during operation.

Starting Heating Mode

Procedure for starting the unit in heating mode.

Sequence of Operation

Cooling Mode Operation

Detailed description of the cooling cycle operation.

Final Installation Checklist

Final checks before unit operation.