EasyManua.ls Logo

Trane 4YCC4042A1090A User Manual

Trane 4YCC4042A1090A
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
June 2020
1188--EEBB3311DD11--11FF--EENN
Single Packaged Gas/Electric
14 SEER Convertible, 2 5 Ton
4YCC4024A1060A
4YCC4030A1070A
4YCC4036A1070A
4YCC4036A1090A
4YCC4042A1060A
4YCC4042A1090A
4YCC4048A1070A
4YCC4048A1090A
4YCC4060A1090A
4YCC4060A1115A
Installer’s Guide
Question and Answer IconNeed help?

Do you have a question about the Trane 4YCC4042A1090A and is the answer not in the manual?

Trane 4YCC4042A1090A Specifications

General IconGeneral
Model4YCC4042A1090A
AirflowUp to 1400 CFM
RefrigerantR-410A
Energy Efficiency Ratio (EER)Up to 12.5
Voltage208/230V
Phase1
Shipping Weight180 lbs
Cooling Capacity3.5 Tons

Summary

Introduction and Safety

Installer's Guide Title

Main title and model information for the manual.

Safety Section Overview

Essential safety warnings and precautions for equipment handling.

Step 2 - Unit Clearances

Determine Unit Clearances

Diagrams and tables detailing required space for unit placement.

Clearance Tables and Dimensions

Tables detailing unit dimensions and corner weights.

Step 3 - Location and Recommendations

Review Location Information

Guidelines for unit placement and environmental considerations.

Clearances and Site Preparation

Further details on unit clearances and preparation advice.

Step 4 - Unit Installation

Ground Level and Rooftop Installation

Procedures for installing the unit at ground level or on a roof.

Lifting and Rigging

Safe practices for handling and positioning the unit during installation.

Ductwork, Gas, and Electrical Connections

Procedures for connecting ducts, gas supply, and electrical power.

Step 5 - Unit Startup and Operation

Unit Startup Procedures

Instructions for initiating operation in cooling and heating modes.

Sequence of Operation

Explains the unit's operational cycles, safety features, and fan settings.

Service Maintenance

Guidelines for routine inspections and servicing of the unit.

Related product manuals