EasyManua.ls Logo

Trane 4YCC4024A1060A - User Manual

Trane 4YCC4024A1060A
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
June 2020
1188--EEBB3311DD11--11FF--EENN
Single Packaged Gas/Electric
14 SEER Convertible, 2 5 Ton
4YCC4024A1060A
4YCC4030A1070A
4YCC4036A1070A
4YCC4036A1090A
4YCC4042A1060A
4YCC4042A1090A
4YCC4048A1070A
4YCC4048A1090A
4YCC4060A1090A
4YCC4060A1115A
Installer’s Guide
Question and Answer IconNeed help?

Do you have a question about the Trane 4YCC4024A1060A and is the answer not in the manual?

Trane 4YCC4024A1060A Specifications

General IconGeneral
Model4YCC4024A1060A
TypeAir Handler
Cooling Capacity2 tons
RefrigerantR-410A
Voltage208/230V
Phase1
Motor TypePSC
Nominal Airflow800 CFM
Depth21 inches

Summary

Safety Section

Safety Warnings and Precautions

Covers critical warnings regarding hazardous gases, voltage, refrigerants, and general safety practices.

Introduction and Shipment Inspection

Introduction

Overview of the installer's guide and its organization.

Inspect Shipment

Procedure for checking the unit for damage, correct specifications, and refrigerant charge after unloading.

Unit Clearances

Clearances for 4 YCC4024-4036 Models

Details required service and combustible material clearances, illustrated with diagrams for specific unit models.

Clearances for 4 YCC4042-4060 Models

Details required service and combustible material clearances, illustrated with diagrams for specific unit models.

Location and Installation Planning

Review Location and Recommendation Information

Guidelines for selecting location and ensuring proper airflow, including horizontal and downflow unit placement.

Unit Installation Overview

Covers flue hood, ground level, and rooftop installation procedures for the unit.

Installation Details

Ductwork Installation

Guidance on attaching downflow and horizontal ductwork to the unit and frame, including canvas connectors.

Gas Piping Installation

Procedures and safety precautions for connecting the gas supply line to the unit, including pressure checks.

Electrical Wiring

Power Wiring and Disconnect Switch

Instructions for power supply wiring, grounding, and disconnect switch installation for the unit.

Control Wiring and Thermostat Connections

Guidelines for low voltage control wiring, routing thermostat cable, and making connections.

Field Wiring Diagram

Schematic showing field wiring connections for thermostat, economizer accessories, and unit control box.

Unit Startup Procedures

Pre-Start Checklist and Cooling Mode Startup

Checklist before starting and procedure for initiating cooling mode operation, including pressure checks.

Heating Mode Startup and Final Checklist

Procedure for starting heating mode, burner operation, and a comprehensive final installation checklist.

Operation and Maintenance

Sequence of Operation

Description of system operation in cooling, heating cycles, and safety sequences.

Service Maintenance

Recommendations for annual service checks and inspections during cooling and heating seasons.

Related product manuals