RT-SVX055D-EN 13
Unit Weights
Table 1. Maximum unit & corner weights (lb) and center of gravity dimensions (in.)
Tons
Unit
Model No.
Weights (lb)
(a),
(a)Weights are approximate. Horizontal and downflow unit and corner weights may vary slightly.
(b)
(b)Weights do not include additional factory or field installed options/accessories.
Corner Weights
(c)
(c)Corner weights are given for information only. 15–25 ton models must be supported continuously by a curb or equivalent frame support.
Center of Gravity (in.)
Shipping Net A B C D Length Width
15 EAC180AD 2077 1758 581 418 358 400 55” 38”
17½ EAC210AD 2163 1844 632 438 357 416 54” 37”
20 EAC240AD 2208 1888 664 457 345 422 53” 35”
22 EAC270AD 2208 1888 664 457 345 422 53” 35”
Figure 10. Corner weights
Rigging
WARNING
Heavy Objects!
Ensure that all the lifting equipment used is properly
rated for the weight of the unit being lifted. Each of the
cables (chains or slings), hooks, and shackles used to
lift the unit must be capable of supporting the entire
weight of the unit. Lifting cables (chains or slings) may
not be of the same length. Adjust as necessary for even
unit lift. Other lifting arrangements could cause
equipment or property damage. Failure to follow
instructions above or properly lift unit could result in
unit dropping and possibly crushing operator/
technician which could result in death or serious injury.
WARNING
Improper Unit Lift!
Test lift unit approximately 24 inches to verify proper
center of gravity lift point. To avoid dropping of unit,
reposition lifting point if unit is not level. Failure to
properly lift unit could result in unit dropping and
possibly crushing operator/technician which could
result in death or serious injury and possible equipment
or property-only damage.
Refer to Figure 11 and Table 1 for typical unit operating
weigh
ts rigg
ing before proceeding.
3. Remove the shipping crate from around the unit. Once
fork trucki
ng i
s complete and unit is ready to be placed
on the curb, remove all 6 fork access brackets to drop
the shipping boards from underneath the unit. Do not
remove the crating from the top of the unit.
4. Rig the unit as shown in Figure 11, p. 13. Attach
adequate s
trength lifting slin
gs to all four lifting
brackets in the unit base rail. Do not use cables, chains,
or slings except as shown.
5. Install a lifting bar, as shown in Figure 11, to protect the
un
it and to
facilitate a uniform lift. The minimum
distance between the lifting hook and the top of the
unit should be 7 feet.
6. Test-lift the unit to ensure it is properly rigged and
balanc
ed, make any necessary rigging
adjustments.
7. Lift the unit and position it into place.
8. Downflow units; align the base rail of the
unit with the
curb rail
while lowering the unit onto the curb. Make
sure that the gasket on the curb is not damaged while
positioning the unit.
Figure 11. Rigging and center of gravity data