EasyManua.ls Logo

Trane GBC036-060 - Installation; Checklist

Trane GBC036-060
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
22 RT-SVX058D-EN
Checklist
Use the following checklist in conjunction with the general
checklist (“General Unit Requirements,” p. 15) to ensure
that the unit is properly installed and ready for operation.
WARNING
Hazardous Voltage!
Disconnect all electric power, including remote
disconnects before servicing. Follow proper lockout/
tagout procedures to ensure the power can not be
inadvertently energized. Failure to disconnect power
before servicing could result in death or serious injury.
Check all electrical connections for
tightness and
“point of termination” accuracy.
Verify that the condenser airflow is
unobstructed.
V
erify that the condenser fan and ind
oor blower turn
freely without rubbing and are properly tightened on
the shafts.
Check the supply fan belts for proper tension and the
fan bearings for suffi
cient lubrication. If the belts
require adjustment, or if the bearings need lubricating,
refer to the maintenance section of this manual for
instructions.
Verify that a condensate trap i
s installed and the piping
is properly sized and pitched.
Verify that the correct size and number of fi
lters are in
place.
Inspect the interior of the unit for tools and debris and
install all
panels in preparation for starting the unit.

Related product manuals