EasyManua.ls Logo

Trane GEVE - Page 36

Trane GEVE
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
WSHP-SVX01AA-EN
Figure 31. Front return/top supply
9
GEVE 20 and 25
tons (60 Hz); GEVE 15 and 20 tons (50 Hz)
RETURN AIR
OPENING
SUPPLY OPENINGS
WITH 1" DUCT
FLANGE
W.I. 2"
NPTI
2 5/8"
4 1/4"
12 1/2"
D
B
DRAIN 3/4"
NPTI
W.O. 2"
NPTI
38 7/8"
27 1/8"
68"
A
C
A
1"
(25.4)
HIGH VOLTAGE
7/8" O.D.
20 1/2"
2 3/8"
74 1/2"
81 5/8"
31 1/2"
36 1/4"
4 3/4"
6 7/8"
19 1/8"
1
1/4"
6 1/4"
CONTROL
BOX ACCESS
TOP VIEW
FRONT VIEW
SIDE VIEW
24 VOLT
1 1/8"
O.D.
WCI mounting
location
Table 22. Dimensional data front return/top supply GEVE 20 and 25 tons (60 Hz); GEVE 15 and 20 tons (50 Hz)
Unit (60 Hz) Unit (50 Hz)
A B C D
20 tons 15 tons
15-5/8 in. 13-1/2 in.
12 in.
20-7/8 in.
25 tons Std Static 20 tons Std Static
14-3/4 in. 15-7/8 in. 13-7/8 in. 23-1/2 in.
25 tons High Static 20 tons High Static
15-5/8 in. 13-1/2 in.
12 in.
23-1/2 in.
UUnniitt DDiimmeennssiioonnss
9.
NEC requires that the GEV072-300 front return must be a non-ducted return.

Table of Contents

Other manuals for Trane GEVE

Related product manuals