EasyManua.ls Logo

Trane Sintesis RTAF 200 SE SN LN User Manual

Trane Sintesis RTAF 200 SE SN LN
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
RLC-SVX19G-GB
RTAF SE/HE/XE/HSS/HSE
R134a, R513A, R1234ze
Air-cooled
Helical-rotary chillers
300 - 1900 kW
Installation
Operation
Maintenance
Sintesis chillers are part of the Ingersoll Rand EcoWise™ portfolio
of products that are designed to lower their environmental
impact with next-generation, low global warming potential
(GWP) refrigerants and high effi ciency operation.
Original instructions

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane Sintesis RTAF 200 SE SN LN and is the answer not in the manual?

Trane Sintesis RTAF 200 SE SN LN Specifications

General IconGeneral
CategoryChiller
Cooling Capacity200 tons
RefrigerantR-134a
Compressor TypeScrew
ModelRTAF 200 SE SN LN

Summary

Installation Operation Maintenance

Warnings and Cautions

Highlights potentially hazardous situations that could result in death, injury, or property damage if not avoided.

Safety Recommendations

Lists crucial recommendations for maintenance and service visits to prevent accidents and damage.

Pre-Installation

Installation Requirements

Unit Model Number Description

General Data

General Electrical Recommendations

Installer-Supplied Components

Power Supply Wiring

Specifies requirements for sizing, selecting, and installing power supply wiring and fused disconnect switches.

Operating Principles

Refrigerant and Oil-charge Management

Highlights the importance of proper oil and refrigerant charge for unit operation and performance.

Pre-Start Checkout

Installation Checklist

A checklist to verify all recommended installation procedures are accomplished before unit startup.

Unit Voltage Power Supply

Ensures the supply voltage meets criteria and checks for proper range and imbalance.

Unit Start Up Procedures

Daily Unit Start Up

Details the sequence of operations for starting the chiller, assuming no diagnostics or malfunctions.

Seasonal Unit Startup Procedure

Outlines the steps for preparing the unit for seasonal startup, including valve checks and auxiliary equipment.

Unit Start Up Procedures (continued)

Temporary Shutdown and Restart

Describes the procedure for short-term unit shutdowns for maintenance or repair.

Extended Shutdown Procedure

Details the steps for taking the system out of service for an extended period, including leak testing and draining.

Periodic Maintenance

Refrigerant Emission Control

Guidelines for refrigerant handling, recovery, recycling, and minimizing emissions.

Periodic Maintenance (continued)

Refrigerant Filter Replacement – Changing Procedures

Instructions for identifying and replacing a dirty filter element based on temperature gradient.

Remaining Oil Charge

Describes how to add oil to the motor cavity or suction line before installing the compressor.

Field Oil-Charging Procedure

Provides steps for oil charging when virtually all oil has been removed or after component servicing.

Condenser Coils MCHE Maintenance

Related product manuals