EasyManua.ls Logo

Trane YSC060 - Final System Setup; Final System Setup Checklist

Trane YSC060
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33RT-SVX31A-EN
Final System Setup
After completing all of the pre-start and
start-up procedures outlined in the
previous sections (i.e., operating the
unit in each of its Modes through all
available stages of cooling & heating),
perform these final checks before leav-
ing the unit:
[ ] Program the Night Setback (NSB)
panel (if applicable) for proper un-
occupied operation. Refer to the
programming instructions for the
specific panel.
[ ] Verify that the Remote panel “Sys-
tem” selection switch, “Fan” selec-
tion switch, and “Zone Temperature”
settings for automatic operation are
correct.
[ ] Inspect the unit for misplaced tools,
hardware, and debris.
[ ] Verify that all exterior panels includ-
ing the control panel doors and con-
denser grilles are secured in place.
[ ] Close the main disconnect switch or
circuit protector switch that provides
the supply power to the unit’s termi-
nal block or the unit mounted dis-
connect switch.
Final System Setup

Table of Contents

Related product manuals