7
Assembly
Initial start-up should be carried out before starting assembly
– Download the app to the mobile phone
Establish the Bluetooth connection to the iNet Box
Search for the location with the best Bluetooth reception
– Establish the position of the iNet Box (safety clearance >20cm
from people).
– Fix the iNet Box to the wall at the established position using
the two adhesive strips (the surface must be clean and
smooth).
– Lay the iNet Box cables clear of the 230 V cables (approx.
20cm) .
– The cables must have strain relief.
Subject to technical changes.