V1.0
While installation is all finished, turn on the main utility-grid AC circuit breaker. Your system will
start producing power after about a two-minute wait time.
The LED will flash green and red at start-up. The definition of LED is shown below.
Flashing Green (0.2-0.8s )
Remote Active Power Control
In some countries, it might be required that the generating plants should be equipped with a logic
interface (input port) to cease the output of active power or limit active power to a regulated level.
This logic input can be the RS485 port, Ethernet port, and so on. TSUN microinverter provides an
extra power control device that contains an RS485 port for this remote active power control. For
more information, refer to the “User Manual of TSUN power control device”.
Self-Test Function for Italy
TSUN microinverter and TSUN monitoring system provide a Self-test function for the Italy market.
For more information, refer to the “User Guidance of Self-test Function”.