http://www.tyan.com
3. Remove the external cap from the rail frame.
4. Align and install the carrier frame with package into the slot on the rail frame.
Note: During installation, observe the following:
-) make sure to push the carrier frame with package towards the end of the
rail frame until it clicks in place.
-) do not drop the carrier frame or touch the package pad to avoid component
damage.
5. Using your thumbs and forefinger, remove the PnP cap by lifting it up
vertically.