ź Connect the controller to the power supply. It will be automatically set into a working mode.
ź Put 1 bag of salt tablets into the brine tank.
ź Pour 15 liters of water to the brine tank.
ź Programm the controller according to the instructions on the following pages.
ź Perform a manual media regeneration process.
ź Hot water can damage the soening system.
ź When installing the device near heater, install a check valve between the soener and the heater. This will prevent
from hot water retracting.
ź Feed water pressure must be between 2,5 and 4 bar.
ź The required ambient temperature for the soener is 1-30 C. Protect the soener from freezing.
ź Use ONLY salt tabets for regeneration.
outputinput
output
input
ź Lubricate the rubber sealings (o-rings) using silicone grease.
ź Make all connections according to the local codes and regulations.
ź The soener can be connected to any pipe system (PVC, PPR, elastic, etc.).
ź Connections are made using push-in nipples which are the by-pass valve accessories.
ź Secure the connection between the stems and bypass using red clasps.
ź You can use half pipe unions to connect the soener.
ź When installing the device mind the proper water input and output (direction is indicated by the arrows on the by-
pass valve).
ź Use a min 1/2” elastic hose as a drain line. The hose must be tightened on an output elbow using metal clamp.
ź To seal the connections use teflon tape only.
ź Aer soener installation, open the main water supply valve.
ź Set the by-pass in a service mode (open the input valve, close the output valve). Water should fill the tank with ion-
exchange resin.
Fig. 1. Bypass
15
EN