EasyManua.ls Logo

VAIR SMART - Moving and Unpacking; Setting up

Default Icon
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
3
5
4
6
1
2
EN_13
3.2 Moving and Unpacking
3.Installation
Once the machine has been received, it must be moved to the place where it will be installed:
Before moving
Make sure that nobody is within
the lifting and load movement ope-
ration radius and, in particularly
di cult situations, use personnel
who control the movements to be
carried out.
Lifting and moving
Moving the machine must be done
by at least two people in a vertical
position.
Control the route
Avoid bumpy routes, paying atten-
tion to the dimensions and possible
protruding parts.
Cut the nylon straps
It is prohibited to make additional
cuts in the packaging.
Lift the cover
Placing
Try not to damage the packaging as
it could be used again in the future.
In the established place and to con-
nect to the network.
Do not manipulate the machine by
taking from the evaporators.
Damages that the machine may su er during transport and moving are not covered by the GUARANTEE. Repair and replace-
ment of parts that may get damaged must be paid for by the client.
Recycling
Conserve for future use
On the other hand, it is possible to
conserve the packaging as it might
be useful for future movements or
transport of the machine.
On the one hand, it can be subdivid-
ed according to the type of materials
of which it is made up and they can
be treated according to the provi-
sions of the rules in force in the coun-
try where the machine is located.
Treatment of the packaging.
Before the fi rst start-up:
Washing and sanitisation
It is recommendable to carry out
careful cleaning and sanitisation of
the machine. (See Cleaning section)
Electrical connection
Plug the power cable to
the connector on the back
of the machine. Make sure
that the plug correspond
to the type of the socket.
3.3 Setting up
3.Installation