EasyManua.ls Logo

Vertiv Tech NetSure 731 A41-S8 - Chapter 1 Overview; Composition and Configuration

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 1 Overview 1
NetSure 731 A41 Subrack Power System User Manual
Chapter 1 Overview
This chapter introduces model composition and configuration and features of NetSure 731A41-S1 and NerSure
731A41-S2 (abbreviated as 'power system' hereinafter).
1.1 Composition and Configuration
Composition
The power system is composed of power distributionrectifier modules and controller module.
Take NetSure731A41-S1 for example, the internal structure is shown as Figure 1-1.
Positive terminal
Battery MCB
Controller
Rectifier
AC input terminal N
AC input terminal L
Earthing screw
AC output terminal L
AC output terminal N
Non-prority load
Prority load
Figure 1-1 NetSure 731 A41- S1/S2 system instruction
The internal structure of NetSure731A41-S8 is as shown in Figure 1-3.
监控模块
电池空开
正接线端子
重要负载(PL) 非重要负载(NPL)
接地螺钉
整流模块
交流输入N
交流输入L
Prority load
Non-proity load
Positive terminal
Battery MCB
Controller
Earthing screw
AC input terminal N
AC input terminal L
Rectifier
Figure 1-1 NetSure 731 A41- S8 system instruction

Related product manuals