EasyManua.ls Logo

Vertiv Liebert CRV CRD100-0D00A - Chapter 2: Installation; 2.1 Pre-Installation

Vertiv Liebert CRV CRD100-0D00A
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Vertiv | Liebert CRD10 | User Manual 15
Chapter 2: Installation
WARNING! Risk of improper wiring, piping, moving, lifting and handling. Can cause equipment
damage, serious injury or death. Installation and service of this equipment should be done only by
qualified personnel who have been specially-trained in the installation of air-conditioning equipment
and who are wearing appropriate, OSHA-approved PPE.
NOTICE:
Before installing unit, determine whether any building alterations are required to run piping, wiring
and duct work. Follow all unit dimensional drawings and refer to the submittal engineering
dimensional drawings of individual units for proper clearances.
The Installation process consists of the following procedures, namely-
Pre-installation
Installation Preparation
Mechanical Installation
Electrical Installation
2.1 Pre-Installation
CRD10 precision air conditioner is an engineered equipment and requires installation works for which the
preliminary preparation is very important. This chapter describes the pre-installation, including how to prepare
the installation environment, space and reserve the maintenance space; the air conditioner running and
storage environment requirement, and how to unpack and inspect.
NOTE: Please read this chapter carefully before installation.
Pre-installation contains the following 3 sub sections, namely-
Transportation & Movement
Unpacking
Inspection

Table of Contents

Related product manuals