EasyManua.ls Logo

VEVOR XRJF-21 - Installation Instructions; Machine Installation; Power Supply Installation

VEVOR XRJF-21
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation of Slushy Machine
When moving, the box should be kept as straight as possible, and the maximum tilt
should not exceed 45°. When moving, please ensure that there are at least two or more
people, and avoid upside down and horizontal placement.
The maximum stack cannot exceed 2 layers.
06
Installation Instructions for The Whole Machine
Installation of the Power Supply
1The power supply connected should be the same as the one indicated on the nameplate of the
machine.
2Do not connect other electrical appliances to the same outlet.
3Y-type connection, must be replaced by the manufacturer, seice agencies or qualied personnel
to connect the power cord.
4The power plug should be plugged directly into a power outlet with a ground wire, not into a
tempora terminal block. All wiring must comply with national or regional standards.
5. Voltage uctuations shall not exceed ±10% of the rated voltage, otherwise a voltage regulator shall
be installed.
1. Remove all packaging components.
2. Check if the machine is damaged during transpoation, and then remove the attachments.
3. This series of slushy machine should be placed in a clean place with air circulation, not suitable for
open air, not suitable for direct sunlight and rain, nor can it be placed near the heat source.
4. The ambient temperature around the series of machines should not be less than 3 °C/37.4°F, not
higher than 38 °C/100.4°F, and the appropriate spacing should be retained around the four sides to
maximize the eciency of the slushy machine and the heat dissipation of the machine.
5. When the slushy machine is installed, please place the slushy machine horizontally, and items
cannot be placed on the top.

Related product manuals