EasyManua.ls Logo

Victoria Arduino EAGLE ONE PRIMA

Victoria Arduino EAGLE ONE PRIMA
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
156
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
9
P
P
P
PR
R
R
O
O
O
G
G
G
R
R
RA
A
A
M
M
MM
M
M
IN
N
N
G
G
G
2
The 1A, 1B and 1C buttons keypad will be
fixed and a 3 seconds countdown will ap-
pear on the ghost display. At the end of
the countdown, the procedure will auto-
matically starts.
WARNING
Keep attention to the steam and hot
water coming out from the machine.
3
When the inner pressure has been com-
pletely reduced, turn OFF the machine
utilizing the main switch.
NOTE
At the end of this procedure, at the next
powering ON the machine will be ready
to start the FILLING procedure.
9.4.3 FILLING PROCEDURE
The filling procedure is a not-stoppable
procedure and permits to fill up the cof-
fee boiler. It is automatically requested at
first installation, or after the EMPTY BOILER
procedure, or after the RESET PARAMETERS
procedure.
In case it is needed to request it, it's sug-
gestable to perform the EMPTY BOILER pro-
cedure, as described in the previous para-
graph.
The FILLING procedure works like following:
1
Switch the machine ON.
55
55
52
52
54
54
53
53
09

Table of Contents

Other manuals for Victoria Arduino EAGLE ONE PRIMA

Related product manuals