32
Commissioning steps
Inspection steps
Maintenance steps Page
•
1. Commissioning the system............................................................................................... 33
• •
2. Filling the heating system................................................................................................. 35
• • •
3. Checking all connections on the heating water and DHW sides for leaks................... 37
•
4. Venting the heating system............................................................................................... 37
•
5. Checking the gas type....................................................................................................... 38
• • •
6. Removing the front panel.................................................................................................. 38
• • •
7. Checking the static pressure and supply pressure........................................................ 39
•
8. Function sequence and possible faults........................................................................... 41
•
9. Setting the maximum heating output............................................................................... 42
• •
10. Performing an actuator test.............................................................................................. 42
•
11. Adjusting the integral circulation pump rate................................................................... 42
•
12. Checking the balanced flue system for leaks (annular gap test).................................. 45
•
13. Burner adjustment when connecting multiple flues to a shared flue system.............. 45
•
14. Removing the burner......................................................................................................... 46
• •
15. Checking the burner gasket and burner gauze assembly.............................................. 47
• •
16. Checking and adjusting the ignition and ionisation electrodes.................................... 49
• •
17. Checking the back draught safety devices...................................................................... 50
•
18. Cleaning the heating surfaces.......................................................................................... 51
• •
19. Checking the condensate drain and cleaning the trap................................................... 52
• •
20. Installing the burner........................................................................................................... 53
• •
21. Checking the neutralising system (if installed)
•
22. Checking the flow limiter (only for gas condensing combi boiler)............................... 54
• • •
23. Checking the expansion vessel and system pressure................................................... 54
• • •
24. Checking the safety valve function
• • •
25. Checking the electrical connections for firm seating..................................................... 55
• • •
26. Checking all gas equipment for leaks at operating pressure........................................ 55
• • •
27. Fitting the front panel........................................................................................................ 55
• •
28. Checking the combustion quality..................................................................................... 56
• • •
29. Checking the flue system for unrestricted flow and leaks
•
30. Matching the control unit to the heating system............................................................ 57
•
31. Adjusting the heating curve.............................................................................................. 57
•
32. Instructing the system user.............................................................................................. 57
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
6221465