Final checks
1. If a time switch has been built into
the control unit:
Set required activation periods as
per the time switch operating
instructions.
Time switch operating
instructions
2. Fill in the relevant details for the
installation in the benchmark log-
book supplied in the instructions
pack and affix the self adhesive bar
code strip from the outside of the
boiler packaging to this logbook.
User´s instructions
Upon completion of commissioning
and testing, hand the appliance over
to the user, with reference to the follo-
wing.
&
Give the users instructions to the
responsible person for the property
and emphasise their responsibilities
under the current edition of the Gas
Safety (Installation and Use) Regu-
lations.
&
Explain and demonstrate the ligh-
ting and shutdown procedures.
&
Advise the householder on the effi-
cient use of the system, including
the use and adjustment of all sys-
tem controls for both DHW and CH.
&
Advise the user of the precautions
necessary to prevent damage to the
system and to the building in the
event of the system remaining
inoperative during frost conditions.
&
Explain the function of the boiler
safety controls and how to reset
them. Emphasise that if cut-out per-
sists, the boiler should be turned off
and the installer or service engineer
consulted.
&
Stress the importance of an annual
service by a registered heating
engineer.