Front panel installation
1. Hang the front panel to the wall
mounting frame by the appropriate
hook.
2. Press down the front panel at the
bottom.
3. Insert the screw at the top of the
boiler.
Hinweis
The outer case forms a seal with
the combustion box: It must there-
fore be securely fitted with the
screw provided.
Start-up the boiler
1. Open gas shut-off valve and switch
on mains voltage.
2. Check the operation of the appli-
ance in both central heating and
DHW modes.