EasyManua.ls Logo

ViewSonic PJD5122 - Page 29

ViewSonic PJD5122
107 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Assembly HSG ILL Module:
3.1 CM Assembly
I. Insert “Clip CM Side” first, and then place “Clip Front CM” to fixed-shaft of ILL SUB
before locking screw (Fig. 3-1, Fig. 3-2).
II. Assemble Mylar SUB HSG to HSG ILL well (Fig. 3-3).
III. Assemble CM to HSG ILL and to make CM contact three datum on the HSG ILL
Well (Fig. 3-3).
IV. Assemble” MYLAR CM ” to the CMD firstly, “CLIP TOP CM”(with forceps) to the
“HSG ILL” (Fig. 3-4,).
V. To check and make sure “CLIP of CM” hooks the HSG ILL very Well (Fig. 3-5).
VI. Paste “Sponge tube AL” on cannelure of” HSG ILL” (Fig. 3-6).
3.2 FM Module Assembly
1. FM Module must be placed to fixed shaft and on the datum surface of “ILL SUB”
and then lock with screw well(Fig. 3-7).
Fig. 3-1 Fig. 3-2
Screw
Clip CM Side
Fixed shafts
of ILL SUB
Confidential - Do Not Copy
PJD5122
ViewSonic Corporation
28

Other manuals for ViewSonic PJD5122

Related product manuals