EasyManua.ls Logo

Viking CFDCFB5363 - Performance Checklist

Viking CFDCFB5363
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
Performance Checklist
Verify cabinet size.
Verify electrical supply and water supply
(if applicable).
Install anti-tip device(s) and verify unit is
secure.
Position unit in cutout, level at desired
height and secure unit.
Plug-in unit and verify operation.
Connect water supply (if applicable).
• Verify icemaker fill tube is properly
inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
Align/square door(s).
Verify drain pan is properly installed and
there are no leaks on water connection.
Install kickplate.
Remove internal packaging and labels
and wipe unit down.
Installer’s information:
Installer’s name:
_____________________________
Installer’s company:_________________________
Date: ________________________________________

Related product manuals