EasyManua.ls Logo

Vision REVO - Mechanical Installation; Installation Place

Vision REVO
122 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth Power Your Vision
47
9.4 Mechanical installation
9.4.1 Installation place
The installation location of lithium battery plays a key role in its safety, service lifetime
and performance. It is recommended to install the lithium battery in an air-conditioned
room. The system should be installed in a place allowed for convenient wiring, easy
maintenance, and easy operation.
Figure 9.4-1 cabinet clearance

Table of Contents

Other manuals for Vision REVO