EasyManuals Logo

Vision REVO User Manual

Vision REVO
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #76 background imageLoading...
Page #76 background image
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth Power Your Vision
76
As an alternative to cables, copper busbars can be used
Figure 10.6-14 the copper busbar review
10.6.5 GBMS 24V power connection
The GBMS power supply cable is connected from CBMS(dc24v-out) to GBMS (dc24v-in).
Pay attention to the sequence of 24V positive and negative poles to avoid the risk of
burning GBMS, and make sure to tighten the wire with Slotted screwdriver.
The 24V power supply of GBMS is controlled by an isolating switch with
fuse.
Figure 10.6-15 24VDC cable spec

Table of Contents

Other manuals for Vision REVO

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vision REVO and is the answer not in the manual?

Vision REVO Specifications

General IconGeneral
TechnologyActive Shutter
Contrast Ratio1000:1
Battery Life40 hours
Battery TypeRechargeable Lithium-ion
Frame StyleFull Frame
Charging Time2-3 hours