Packing Press 100 P2
Version: 111300001, M0004459B
Date: 13.12.2013 - 18 / 44 -
4 Starting up / re-starting of the machine/line
4.1 General
NOTE!
The machine/line and all machine/line components must be checked by a specialist before starting
up and before re-starting after significant changes.
4.2 Controls and settings work before first starting up/re-starting of line
Check the machine/line for loose parts (e.g. forgotten tool)!
Check all cable connections (clamp and plug connections) as also all pneumatic pipelines of the machine/line. Pay
particular attention to damaged and loose cable and connections (see illustration)
Check that the required safety devices have been placed in an orderly manner and are intact! (see the
chapter "Safety devices")
WARNING AGAINST GENERAL DANGERS
Before cleaning the device or checking the connection cable, to see if this has been twisted or
damaged, switch the machine off
without fail and pull out the mains connector plug!
Picture 4.2-1) Symbol image, control cable and connector point
Changes in comparison with normal operation such as
- higher capacity feeding
- higher noise development
- higher acceleration or delay, higher vibration amplitudes
- unusual noises or unusual smells
- response of the safety devices without a motivational cause
are grounds for recognising that the function of the line/machine is impaired.
Detrimental effects such as this or similar are to be immediately reported by the operator to the person responsible.