8 Maintenance
34
100_0402_mt_0001.fm
8 Maintenance
8.1 Period maintenance schedule
The following table contains the basic maintenance jobs for the machine. Jobs
selected with a check mark can be performed by the operator. The jobs marked
with a small box require special training and special equipment.
* Clean more often in dusty areas.
Daily
before
Opera-
tion
After the
first
20 hours
Every
50 hours
Every
100
hours
Every
300 hours
Check the fuel level.
Check the engine oil level.
Check the air cleaner. Replace when
necessary.*
Check external fastening parts.
Clean air cleaner elements.*
Check shockmount for damage.
Change the engine oil.*

Check and clean spark plug.
Check and adjust the valve interval.
Clean fuel tank.*
Check the fuel line.
Replace when necessary.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson GV 7000A and is the answer not in the manual?

Wacker Neuson GV 7000A Specifications

General IconGeneral
BrandWacker Neuson
ModelGV 7000A
CategoryPortable Generator
LanguageEnglish

Related product manuals