EasyManua.ls Logo

Wacker Neuson PT 6L - Emergency Shutdown Procedure

Wacker Neuson PT 6L
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PT 6L Operation
wc_tx001597gb.fm 35
When towing, maintain extra space between the vehicles and avoid
soft shoulders, curbs, and sudden lane changes. If you have not pulled
the trailer before, practice turning, stopping, and backing up in an area
away from traffic.
DO NOT exceed 55 mph when towing the trailer.
In most states, large trailers must be registered and licensed by the
State Department of Transportation. Before towing, be sure to check
licensing requirements.
Always refer to the applicable Department of Transportation
regulations before towing.
4.18 Emergency Shutdown Procedure
If a breakdown/accident occurs while the machine is operating, follow
the procedure below.
4.18.1 Stop the engine.
4.18.2 Turn off the fuel supply.
4.18.3 Remove the obstruction.
4.18.4 Unkink the hoses.
4.18.5 Allow the machine to cool.
4.18.6 Contact the rental yard or machine owner.