Operation 5
BA TH412 * 06/2017 * 4512_5-10_Anbaugeraete_en.fm
5-53
Coupling hydraulic connections
Preparations
The pressure on the hydraulic connections has to be
released before they can be coupled.
1. Retract the telescopic boom completely.
2. Lower the attachment until it is barely above the
ground.
3. Stop the engine.
4. Move the control lever 6 back and forth several times.
The pressure on the hydraulic connections on the
loader unit is released.
5. Remove the protective caps from the loader unit
connections.
- To do this, press the connections forward together
with the hydraulic hose.
6. Remove the protective caps from the hydraulic
connections of the attachment.
6
Fig. 80

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson Telehandler TH412 and is the answer not in the manual?

Wacker Neuson Telehandler TH412 Specifications

General IconGeneral
BrandWacker Neuson
ModelTelehandler TH412
CategoryCompact Loader
LanguageEnglish

Related product manuals