EasyManua.ls Logo

Wacker Neuson Telehandler TH412

Wacker Neuson Telehandler TH412
362 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation 5
BA TH412 * 06/2017 * 4512_5-10_Anbaugeraete_en.fm
5-53
Coupling hydraulic connections
Preparations
The pressure on the hydraulic connections has to be
released before they can be coupled.
1. Retract the telescopic boom completely.
2. Lower the attachment until it is barely above the
ground.
3. Stop the engine.
4. Move the control lever 6 back and forth several times.
The pressure on the hydraulic connections on the
loader unit is released.
5. Remove the protective caps from the loader unit
connections.
- To do this, press the connections forward together
with the hydraulic hose.
6. Remove the protective caps from the hydraulic
connections of the attachment.
6
Fig. 80

Table of Contents

Related product manuals